Model NO.: HRMB14AK
Trademark: HRBinzel
Origin: Changzhou, Jiangsu, China
HS Code: 85159000
MIG Welding Torch Swan Neck (Hrmb15ak)
 
MIG Welding Torch Swan Neck (Hrmb15ak)
Item CO2 Swan Neck Compatible with Binzel MB15AK Torch
Type Swan Neck for 15AK
Packing 5 pcs per bag
Certification ISO9001, CCC, CE, ROHS, TUV
MIG Welding Torch Swan Neck (Hrmb15ak)

Changzhou Huarui Welding & Cutting Co., LTD

Established in 1985, we have grown to become one of the largest manufacturers of welding and cutting equipment and accessories in China. We use modern manufacturing equipment and advanced technology to deliver high-quality products.
We specialize in producing MIG, TIG, and Plasma welding torches and their spare parts. With compatibility for Euro, Lincoln, Miller, and Tweco connectors, our products can be used with a wide range of foreign equipment.
1. MIG Welding Torch
Binzel, Bernard, Tweco, Esab, Lincoln/Tregaskiss, Panasonic/OTC, MAXI, Kemppi, Fronius, Mechafin.
2. TIG Welding Torch
WP-24, WP-9, WP-17, WP-26, WP-20, WP-18, etc.
3. Plasma Cutting Torch
Trafimet, Cebora, Panasonic/Esab

MIG Welding Torch Swan Neck (Hrmb15ak)
MIG Welding Torch Swan Neck (Hrmb15ak)
FAQ
Q1: Can I get samples to check the quality?
A: Yes, we can provide samples. For regular items, the sample cost varies depending on the quantity you request. For new products, there may be a minimum order quantity for samples.
Q2: Can I add my logo on the packaging?
A: Yes, we can customize the packaging with your logo. Please send us a trademark authorization letter before placing an order.
Q3: How do you ensure product quality?
A: Every torch undergoes insulation resistance testing, high voltage testing, air/water flow testing, and air/water sealing tests before packing. If any defective items are found, we will either credit your account or replace them in the next shipment.
Q4: What is the ordering process?
A: First, we discuss the details via email or TM. Then we issue a Proforma Invoice for your confirmation or a Trade Assurance payment link. You will need to make a full prepayment before production starts. Once the payment is received, we begin processing the order. It usually takes 5–15 days if the item is not in stock.

Core Wire

ZHENAN NEW METAL CO .,LTD , https://www.zanewmaterial.com

Posted on