Recently, Royston Co., Ltd. has completed an engine overhaul of Bluewater's floating production storage and offloading vessel (FPSO) "Haewene Brim".
It is reported that the FPSO is 252 meters long and has been serving Shell UK companies in the Pierce offshore oil field in the North Sea of ​​the UK since 1999.
"The Royston team performed very professionally during the entire overhaul and worked very hard," said Steve Williams, head of mechanical mechanics at Haewene Brim. "I hope that the next major overhaul will work with them again."
It is understood that the "Haewene Brim" was previously a multi-purpose shuttle oil tanker built by Samsung Heavy Industries of South Korea. It was converted into FPSO by Aker McNulty Shipyard in 1998. The power on board is provided by the main generator set, including four 5.2 MW Wärtsilä W46 medium speed diesel engines.
After the overhaul of the first engine, the overhaul of the second engine began immediately.
Royston has completed an engine overhaul

Plate Flange

The Plate Flange is a kind of the flange,which weld with the end of the pipe through inserting  the pipe into the plate flange hole.The sealing surface of plate flange is flat face.

plate-flange

Production Size:DN10-DN3000

Pressure range:PN2.5,PN6,PN10,PN16,PN25

Production Standard:BS,JIS,GOST,ANSI,DIN,GB

Main Material of parts:

A105,20#,Q235,16Mn,A350 LF1,LF2,CL1/CL2,LF3 CL1/CL2,A694 F42,F46,F48,F50,F52,F56,F60,F65,F70;A182 F304,304L,F316,F316L,321,18-8,A182F1,F5a,F9,F11,F12,F22,F91,A182 F12,F11,16MnR

The cost of Plate Flange is very low,it is very easy to produce,So it is widely used to many industries.

Plate Flange

Plate Flange,Carbon Steel Plate Flange,Alloy Steel Plate Flange,304L Plate Flange

CANGZHOU HENGJIA PIPELINE CO.,LTD , https://www.hj-pipeline.com

Posted on