Electrolytic manganese metal deposition process is cathode Mn products. Since the manganese potential is very negative (-1.18V), and the Mn 2+ hydrolysis pH Ó¨ 25 is 7.655, the pH Ó¨ 70 is 6.65. In order to increase the hydrolysis pH and improve the current efficiency, the electrolyte must maintain high (NH 4 ) 2 SO. 4 content, its role is: 1 the formation of manganese ligand ions, improve the pH value of Mn 2+ hydrolysis, so that Mn 2+ is not easy to hydrolyze, see Figure; 2 buffering; 3 increase the conductivity of the solution. The normal electrolysis operation cannot be maintained without adding (NH 4 ) 2 SO 4 .
The requirement of (NH 4 ) 2 SO 4 content is related to the use of antioxidants in electrolysis. For example, SeO 2 is used as an antioxidant, and the content of (NH 4 ) 2 SO 4 is 100-120 g/L, such as using SO 2 as an antioxidant. The dosage of (NH 4 ) 2 SO 4 needs to be 130~140g/L.
The main reaction formula of MnCO 3 ore leaching is MnCO 3 +H 2 SO 4 ===MnSO 4 +H 2 O+CO 2 ↑
Fe 3 O 4 +4H 2 SO 4 ===FeSO 4 +Fe 2 (SO 4 ) 3 +4H 2 O
FeO+H 2 SO 4 ===FeSO 4 +H 2 O
CuO+H 2 SO 4 ===CuSO 4 +H 2 O
CoO+H 2 SO 4 ===CoSO 4 +H 2 O
NiO+H 2 SO 4 ===NiSO 4 +H 2 O
MgO+H 2 SO 4 === MgSO 4 +H 2 O
Calculated according to the requirement of leaching solution containing Mn40kg/m 3 , the calculation formula of manganese carbonate ore powder is

The ratio of mineral acid to mass (mass ratio) of MnCO 3 ore fines is 1:0.55~0.6. Main technical conditions for leaching of MnCO 3 ore:
Temperature: 1 is not heated, the heat of H 2 SO 4 can be used to raise the slurry to 55~65 °C. 2 external heating to 80 ° C
Liquid to solid ratio: 8~10:1
Leaching acid: 70~80g/L
Leaching end point pH: 1.5
Leaching time: 2~3h

Towable Trailer Boom Lift

The curved arm aerial work vehicle is widely used for installation, maintenance and climbing operations in municipal, electric power, street lamp, advertisement, communication, photography, garden, traffic, wharf, airport port, large industrial and mining enterprises and other industries.

It is applicable to all kinds of rugged terrain in the field and has a wide range of space operations. It is mainly used for construction machinery and equipment of buildings, bridge construction, ship manufacturing, airports, mines, port terminals, communication and power facilities and outdoor advertising.

It can be hung on the car, synchronized with the car, and suitable for field high-altitude operation. Lifting mode: 1. Use 380-220v power supply. 2. It is inconvenient to use power supply. You can use battery to drive the lifting. Beautiful appearance and convenient walking.
Install the crank arm elevator on the vehicle and use the vehicle power to drive the lift. Suitable for long-distance field work at height.

Towable Boom Lifts,Towable Manlift Trailer Boom Lift,Trailer Towable Man Boom Lift,Towable Boom Lift Trailer

zhongcan machinery Co.,Ltd , https://www.zclift.com

Posted on